• 0 Items - $0.00

Nitro DTF-2 Head 24 Inch Printer And Shaker Combo

$22,990.00

2 Head 24″ Inch Nitro DTF Printer & Shaker Combo
Automatic Powder Recirculation On Shaker
Free 2 Day Onsite Installation & Training
1 Year Warranty-Excluding Print Heads
Lifetime USA Support & Customer Service Via Email & Phone Support
Digital Factory RIP Software for PC

Requirements:
*A/C 110v for printer
*A/C 220v for Shaker
*Climate control set to 70-75 degrees and 40 – 60% humidity
*Typical learning time is 6 – 20 hours over a period of 1 week.
*Vent to the outside with an exhaust fan.
*Use of non-UploadTransfers ink, film, or other supplies will void warranty coverage. Must complete on-site training.

Training:
*Training is included. We send a technician to your location for 2 days of setup and training.
*Fume Extraction: Please note that fume extraction is essential when using the Shaker/Dryer. Due to the hazardous nature of the fumes, DTF printing and heat pressing should be performed in a well-ventilated area.
*Powder Handling: Inhalation and skin exposure to uncured powder adhesive can pose a health risk. Wear proper respiratory protection and gloves when handling the powder.

2-3 WEEK BACKORDER TIME FRAME.

UV DTF Film 24″ Rolls

$350.00

UV DTF Film 24″x320′  A & B Rolls Premium Upload Transfers Brand Film

 

A Film – White, Adhesive/Printable surface
B Film – Lamination
Size (A Film & B Film)
Length: 109 yd
Actual Width: 24” (61cm)
Printable Width: 23.62” (60cm)

Nitro UV DTF-3 Head 24 Inch Printer

$22,990.00

3 Head 24″ Inch Nitro UV DTF Printer
Free 1 Day Installation
3 Year Warranty-Excluding Print Heads
Lifetime Support & Customer Service
2 Day Free Training At Our Ocala FL Location
Printing & Laminating 2-in-1: Save time and money with ready-to-use decals with little hassle. No additional lamination machine or process required!
Flexi-sign rip included
No glue printing-adhesive is on the film, prolonging life of the print heads.
*Use of non-UploadTransfers ink, film, or other supplies will void warranty coverage. Must complete on-site training.
2-3 WEEK BACKORDER TIME FRAME.

1 10 11 12 101
0
Your Cart is empty!

It looks like you haven't added any items to your cart yet.

Browse Products